• January 20, 2022
Check The Result Of Three Star Hydropower IPO

Check The Result Of Three Star Hydropower IPO

Three Star Hydropower is a public company and it is located at Province 1, Haleshi Tuwachung Municipality, Khotang. Three Star Hydropower was established back in 2072 BS. With a total capacity of 7.151 MW, this hydro project had received Survey License on 2073.07.09 BS and a Generation License on 2074.09.03 BS.

The team of Three Star Hydro has successfully completed Kutheli Bukhari Hydro Power Project of 998 KW, located at Suspa Chemawatti, Dolakha which has already into operation since 2072 BS.

Three-star hydropower is going to issue 1,231,250  units of share to the general public and the local people of the project area. Himalayan Capital Ltd is the issue manager for the Three Star Hydropower IPO.

Check The Result Of Three Star Hydropower IPO

There are multiple ways to check the result of Three Star Hydropower IPO results

Method 1:

You can check the results from the CDSC IPO result website:

CDSC IPO Portal

Method 2:

You can also check the result of the Three Star Hydropower IPO from the MeroShare website or mobile app.

MeroShare

Method 3:

In this option, you can check the result of the Three Star Hydropower IPO from Himalayan Capital Ltd.

Himalayan Capital Ltd

 

Leave a Reply

Your email address will not be published. Required fields are marked *